Cooling tower installation and commissioning
Complete installation of new cooling towers and replacement of existing equipment. Site assembly, lifting, mechanical work, system integration, operational testing and commissioning.
Discuss your system
From equipment arrival to an operating system
Installation is managed as a complete task, from site constraints and lifting coordination through assembly to operational checks. For both open and closed-circuit towers, the requirements of the actual equipment and connected system govern the work.
Site preparation and assembly
Where required, existing equipment is dismantled and removed before positioning, crane-lift coordination, on-site assembly and mechanical installation. Modifications needed for installation are coordinated with site conditions.
Integration with the existing system
Related mechanical and piping work can be included where required. Connections, access and operating conditions are checked with the complete system in mind.
Testing and handover
Mechanical checks precede operational testing and commissioning. The fan, drive, water distribution and relevant assemblies are checked according to the equipment configuration. Scheduled maintenance and documented condition tracking can continue after handover.


You have a cooling tower. We take it from there.